Well, the kiln is only half working. First was a programming error...heating 5˚ an hour instead of 500˚ an hour for that segment. Marc reprogrammed it, all seemed well until we checked it again later at 1370˚ with the FTH error message...failure to heat, which meant it couldn't heat up as fast as it was programmed for. Front loading glass casting kilns have heating elements in the top, all three sides, and the door. Turns out only the top and door elements are coming on which means it takes longer to heat up. We think we can still get the pieces cast for this box with the kiln as is, it will just take a longer firing schedule. Once we've got all the pieces cast then he can take his time trying to figure out why the side elements aren't coming on when they're on the same circuit as the door, especially if he has to replace the coils.
The test firing is done, the face with flowers on a heart mold cool enough to take out of the kiln and it looks fine, has a little devitrification which is why it looks cloudy at the point, probably from being at a particular temperature for too long.
So the first two pieces for the box, the inlay and the top, are now in and the kiln started. Fingers crossed!
Chloe has totally ignored the scratchy cardboard, even with a sprinkle of catnip. And I'm still not convinced this cat isn't pregnant. I swear her little nipples are getting bigger and her belly is firm though when I squish around on her tummy, I don't feel any lumps in there either.
Today's predicted high is 98˚ with a real feel of 107˚. Currently 91˚, real feel 103˚. No rain forecast til Friday.
I'm at loose ends waiting for these two pieces to come out which will be several days. I should be doing a drawing or a new watercolor but I'm sort of paralyzed with indecision. I've got two books from the library and can't even settle down to read for more than 30 minutes at a time.